top of page
TRX Infrastructure, Jalan Tuk Razak (Package 2)
The 3 Main Tunnels (Section A, B & C) connecting from Jalan Tun Razak & Smart Tunnel to access the The Exchange 106 (TRX Financial District)
Elevation cut section of Tunnel Section A, B & C


Underground Utilities Mapping prior to construction works.
CBD Loop for connection between TRX infraroad. Bridge works connection with MEX Highway and Duke 3



Interfacing coordination between WPC works
Production of every 10m cut section details /Shop drawings from 3D Model. Cut section with Super-E level & Coordinates for construction use.





4D Scheduling by using Primavera P6 work activities programme links with 3D Model.
bottom of page