TRX Infrastructure, Jalan Tuk Razak (Package 2)

TRX 1.PNG

The 3 Main Tunnels (Section A, B & C) connecting from Jalan Tun Razak & Smart Tunnel to access the The Exchange 106 (TRX Financial District)

Elevation cut section of Tunnel Section A, B & C

TRX 2.PNG
TRX 3.PNG

Underground Utilities Mapping prior to construction works.

CBD Loop for connection between TRX infraroad. Bridge works connection with MEX Highway and Duke 3

Capture13.PNG
Capture12.PNG
Capture111.PNG

Interfacing coordination between WPC works

Production of every 10m cut section details /Shop drawings from 3D Model. Cut section with Super-E level & Coordinates for construction use.  

TRX 4.PNG
TRX 5.PNG
TRX 6.PNG
TRX 7.PNG
TRX 9.PNG

4D Scheduling by using Primavera P6 work activities programme links with 3D Model.